From increased production to reduced costs to improved delivery & Modular installation performance, No specialty supplier is better than PKE.
Assembled Sewage Treatment Plant
The factory pre produces the main structure of the sewage treatment plant, assembles it at the project site, shortens the construction period, and reduces civil engineering investment. By adopting advanced design concepts, the footprint of the sewage treatment plant has been greatly reduced.
¥ 0.00
0.00
The factory pre produces the main structure of the sewage treatment plant, assembles it at the project site, shortens the construction period, and reduces civil engineering investment. By adopting advanced design concepts, the footprint of the sewage treatment plant has been greatly reduced.
Water
is the most important natural gift for human being and aquatic life.
Due to continuous technological growth and industrialization, the water
has been fully polluted and categorized as water pollution. The outlet
water of industries and human which accedes the limit of organic and
inorganic components in the water is called wastewater (polluted water).