A three-way segregation system and a gas collection system are set up in the aerobic zone to realize the separation of solid, liquid and gas in the biological reaction tank, which effectively improves the sedimentation efficiency. The superposition of the sedimentation area and the biochemical aerobic area realizes the integrated function, and the separate setting of the secondary sedimentation tank process at the back end of the biochemical tank is eliminated, which greatly reduces the area of the sewage plant, and the investment and operating costs are greatly reduced.
prefabricated construction
The prefabricated design guarantees the integrity of the structure and shortens the construction time. Besides, our equipment can be used alone or scaled up from 5T/D to 100000T/D.